The Corani silver project is located in Puno and is the largest fully-permitted silver deposit in the world.
Reserves & Resources
The Corani property is estimated to contain the following Mineral Resources and Mineral Reserves, which estimates are supported by a Technical Report dated December 17, 2019.
2019 Mineral Resource Estimate
| 2019 Mineral Resources, Corani Project (effective December 17, 2019) | |||||||
|---|---|---|---|---|---|---|---|
| Category | Tonnes (000) |
Silver g/t |
Lead % |
Zinc % |
Silver Moz |
Lead Mlb |
Zinc Mlb |
| Measured | 30,585 | 50.0 | 0.79 | 0.49 | 49.1 | 534 | 329 |
| Indicated | 208,050 | 40.9 | 0.64 | 0.43 | 273.5 | 2,933 | 1,985 |
| Measured + Indicated |
238,635 | 42.1 | 0.66 | 0.44 | 322.7 | 3,466 | 2,313 |
| Inferred | 73,185 | 35.5 | 0.40 | 0.30 | 83.5 | 641 | 484 |
- 2019 Corani Mineral Resources are inclusive of the 2019 Corani Mineral Reserves
The 2019 Corani Mineral Resources were generated within the $30.00/troy ounce silver, $1.425/pound (lb) lead, and $1.50/lb zinc price Lerchs-Grossman economic pit shell and the calculated $10.79/tonne NSR cutoff.
2019 Mineral Reserve Estimate
| 2019 Mineral Reserves, Corani Project (effective December 17, 2019) | |||||||
|---|---|---|---|---|---|---|---|
| Category | Tonnes (000) |
Silver g/t |
Lead % |
Zinc % |
Silver Moz |
Lead Mlb |
Zinc Mlb |
| Proven | 20.3 | 59.7 | 1.00 | 0.60 | 39 | 450 | 269 |
| Probable | 118.3 | 49.9 | 0.88 | 0.55 | 190 | 2,292 | 1,426 |
| Proven + Probable |
138.6 | 51.3 | 0.90 | 0.55 | 229 | 2,742 | 1,694 |
- The Mineral Reserves have been estimated using the definitions of the Canadian Institute of Mining, Metallurgy and Petroleum (CIM).
- The Mineral Reserves have been estimated using the following metal prices: $20.00/oz silver, $1.00/lb zinc, $0.95/lb lead using a revenue factor 1.00 pit shell as a basis for the pit design.
- Only pre-mineral tuff type of material has been considered as reserves.
- NSR Cutoff grades used are equal or higher than: $10.79/t.
- The effective date for these Mineral Reserves is 5 November 2019.
- Totals / Averages may not add up due to rounding of individual tonnes and grades.
- The tonnes and grades shown above are considered a Mineral Reserve because they have been demonstrated to be economically viable through the Corani Project financial model using the following metal prices: $18.00/oz silver, $1.10/lb zinc, $0.95/lb lead.