NYSE American:HSLV Last: Loading… Vol: Loading… Change: Loading…

TSX:HSLV Last: Loading… Vol: Loading… Change: Loading…

Arrange Logistics Shipping
a
M

Projects

Corani

Overview

The Corani silver project is located in Puno and is the largest fully-permitted silver deposit in the world.

Location

Located in the district of Corani, Province of Carabaya, Department of Puno. The Corani property is accessible by road from the town of Macusani, located approximately 30 km due east of the property on the paved dual lane Interoceanic Highway to Juliaca.
(Click on image to enlarge)

Reserves & Resources

The Corani property is estimated to contain the following Mineral Resources and Mineral Reserves, which estimates are supported by a Technical Report dated December 17, 2019.

2019 Mineral Resource Estimate

2019 Mineral Resources, Corani Project (effective December 17, 2019)
Category Tonnes
(000)
Silver
g/t
Lead
%
Zinc
%
Silver
Moz
Lead
Mlb
Zinc
Mlb
Measured 30,585 50.0 0.79 0.49 49.1 534 329
Indicated 208,050 40.9 0.64 0.43 273.5 2,933 1,985
Measured
+ Indicated
238,635 42.1 0.66 0.44 322.7 3,466 2,313
Inferred 73,185 35.5 0.40 0.30 83.5 641 484
  1. 2019 Corani Mineral Resources are inclusive of the 2019 Corani Mineral Reserves
The 2019 Corani Mineral Resources were generated within the $30.00/troy ounce silver, $1.425/pound (lb) lead, and $1.50/lb zinc price Lerchs-Grossman economic pit shell and the calculated $10.79/tonne NSR cutoff.

2019 Mineral Reserve Estimate

2019 Mineral Reserves, Corani Project (effective December 17, 2019)
Category Tonnes
(000)
Silver
g/t
Lead
%
Zinc
%
Silver
Moz
Lead
Mlb
Zinc
Mlb
Proven 20.3 59.7 1.00 0.60 39 450 269
Probable 118.3 49.9 0.88 0.55 190 2,292 1,426
Proven
+ Probable
138.6 51.3 0.90 0.55 229 2,742 1,694
  1. The Mineral Reserves have been estimated using the definitions of the Canadian Institute of Mining, Metallurgy and Petroleum (CIM).
  2. The Mineral Reserves have been estimated using the following metal prices: $20.00/oz silver, $1.00/lb zinc, $0.95/lb lead using a revenue factor 1.00 pit shell as a basis for the pit design.
  3. Only pre-mineral tuff type of material has been considered as reserves.
  4. NSR Cutoff grades used are equal or higher than: $10.79/t.
  5. The effective date for these Mineral Reserves is 5 November 2019.
  6. Totals / Averages may not add up due to rounding of individual tonnes and grades.
  7. The tonnes and grades shown above are considered a Mineral Reserve because they have been demonstrated to be economically viable through the Corani Project financial model using the following metal prices: $18.00/oz silver, $1.10/lb zinc, $0.95/lb lead.

Video

(Click on Video to Play)

Maps & Photos

(Click on images to enlarge)